Our projects.

EV charging and solar installations across apartment blocks, workplaces, and public sites. Every project includes full electrical design, grant funding, and ongoing management.

Service
Sector
Two Rolec dual bollard EV chargers installed beside colourful flower beds and shingle landscaping at Ashby Lodge, Hendon
Load Balancing

Ashby Lodge, Hendon, London

We installed 10 charging sockets across 5 dual-purpose bollard chargers at Ashby Lodge in Hendon, securing £8,500 in OZEV grant funding. The project...

GRANT SECURED: £8,500 • INFRASTRUCTURE: 10 Sockets

View project
EV-ON engineers in branded hi-vis carrying solar panels at sunset on the 13th floor roof of Brooke House, a 15-storey new build tower in Acton, London.
New Build

Brooke House, Acton, London

A 5.4 kWp SolarEdge system on the 13th floor roof of Brooke House, a new build 15-storey apartment tower on Gunnersbury Lane in Acton, London. 10...

SYSTEM SIZE: 5.4 kWp • PANELS INSTALLED: 10

View project
Underground car park at Denver Court showing high-level cable tray infrastructure and multiple Easee chargers on concrete pillars, Hendon
Load Balancing

Denver Court, Hendon, London

We installed 7 Easee 22kW chargers with 9 future-ready points at Denver Court in Hendon, securing £6,950 in OZEV grant funding. The project used...

GRANT SECURED: £6,950 • INFRASTRUCTURE: 16 Points

View project
EV-ON engineer in branded hi-vis on the show home rooftop terrace at Fort Mount, Margate, Kent, during the wall-mounted solar PV install.
Residential

Fort Mount, Margate, Kent

A 1.5 kWp facade-mounted solar PV installation on the rooftop terrace of a show home at Fort Mount in Margate, Kent. Five Perlight Delta 300W...

SYSTEM SIZE: 1.5 kWp • PANELS INSTALLED: 5

View project
Multiple Easee One chargers installed along the perimeter fence with mature trees providing natural screening at Hill Court, Highgate
Load Balancing

Hill Court, Highgate, London

We installed 5 Easee One chargers with 3 future-ready points at Hill Court in Highgate, securing £5,750 in OZEV grant funding. Each charger connects...

GRANT SECURED: £5,750 • INFRASTRUCTURE: 8 Positions

View project
A dual EO Genius 2 charging pedestal with crash barrier and reserved bay sign at Hollywell's fleet depot in St Albans.
Load Balancing

Hollywell, St Albans, Hertfordshire

We installed 12 chargers across office and employee homes for Hollywell, a building contractor in St Albans. A management platform tracks all fleet...

GRANT SECURED: 60% Funded • INFRASTRUCTURE: 12 Chargers

View project
Blue Volkswagen ID electric car charging at an EV-ON public charge point at dusk in Cranbrook, Kent.
Fully Funded

Jockey Lane Car Park, Cranbrook, Kent

We replaced failed BP Pulse chargers at Jockey Lane Car Park with a new public charging network. The parish council paid nothing upfront. We...

CAPITAL OUTLAY: £0 • CHARGING BAYS: 5

View project
Exterior view of the 840 Old Kent Road development in Southwark, London, during construction with HG tower cranes and Canary Wharf behind.
New Build

Old Kent Road, Southwark, London

A 4.84 kWp SolaX system on the upper roof of Block A, a new build high-rise at 840 Old Kent Road, Southwark, London. 11 Jinko Tiger Neo panels on a...

SYSTEM SIZE: 4.84 kWp • PANELS INSTALLED: 11

View project
Completed in-roof solar installation on Pages Cottage, a detached cottage in Broxted, Essex, with all-black Aiko panels flush within the clay tile roof.
Residential

Pages Cottage, Broxted, near Great Dunmow, Essex

A 7.05 kWp in-roof solar PV system on a detached cottage in Broxted, near Great Dunmow in Essex. 15 Aiko Neostar 3S 470W all-black panels mounted...

SYSTEM SIZE: 7.05 kWp • PANELS INSTALLED: 15

View project
Portland Court underground car park with EV charging infrastructure installed by EV-ON, Hendon, London N3
Load Balancing

Portland Court, Hendon, London

We installed EV charging infrastructure across 43 parking bays at Portland Court, securing £22,500 in OZEV grant funding for residents. The project...

GRANT SECURED: £22,500 • INFRASTRUCTURE: 43 Bays

View project
Mitchell House barn conversion at Woolley Barns in Wantage with Easee chargers visible along the car park wall at dusk.
Grant Funded

Purdicom, Wantage, Oxfordshire

We installed 10 Easee 22kW chargers with 7 future-ready points across 17 bays at Purdicom in Wantage, securing £10,950 in Workplace Charging Scheme...

GRANT SECURED: £10,950 • INFRASTRUCTURE: 17 Bays

View project
Three Landis+Gyr chargers on the warehouse wall with an electric Mercedes charging at Route One, Acton Turville
Flat Cable System

Route One, Acton Turville, South Gloucestershire

We installed 3 Landis+Gyr Inch Pro 22kW chargers at Route One's distribution centre in Acton Turville, securing £7,550 in EV Infrastructure Grant...

GRANT SECURED: £7,550 • INFRASTRUCTURE: 3 Chargers (13 Bays)

View project
The Avenue apartment block exterior in Kilburn, London NW6, where EV-ON installed 24 Nexblue EV chargers.
Grant Funded

The Avenue, Kilburn, London

We replaced 24 legacy 3-pin plug sockets at The Avenue, a residential block in Kilburn, with Nexblue Point 2 7kW chargers on a dedicated EV...

GRANT SECURED: £20,400 • INFRASTRUCTURE: 24 Chargers

View project
Five Easee EV chargers installed outside the Spring Centre at The Hospice of St Francis, Berkhamsted with EV parking signage
Sensitive Sites

The Hospice of St Francis, Berkhamsted, Hertfordshire

We ran cables 50 metres beneath the hospice grounds using horizontal directional drilling, crossing under the main entrance and visitor gardens...

GRANT SECURED: £4,250 • CHARGERS: 5 Easee

View project
Top-down view of Jinko Tiger Neo solar panels being installed on the East/West array at The Mirador, Acton.
New Build

The Mirador, Acton, London

A 7.83 kWp SolarEdge system serving the landlord's communal supply at The Mirador, a new build apartment block in Acton, London. 18 Jinko Tiger Neo...

SYSTEM SIZE: 7.83 kWp • PANELS INSTALLED: 18

View project
EV bay ground markings and charger backplates on the perimeter wall at Touchlight workplace car park, Hampton.
Grant Funded

Touchlight, Hampton, Greater London

We installed 7 Easee 22kW chargers with 18 future-ready points across 25 bays at Touchlight in Hampton, securing £14,950 in grant funding. The...

GRANT SECURED: £14,950 • INFRASTRUCTURE: 25 Bays

View project
Two Easee One EV chargers installed on a wall in the car park at Wickliffe Court residential development, Hendon
Grant Funded

Wickliffe Court, Hendon, London

We installed 3 Easee chargers with 6 future-ready points at Wickliffe Court in Hendon, securing £5,550 in EV Infrastructure Grant funding. Each...

GRANT SECURED: £5,550 • INFRASTRUCTURE: 9 Bays

View project
Aerial view of Zeus Packaging warehouse and staff car park at Stratton Business Park, Biggleswade
Load Balancing

Zeus Packaging, Biggleswade, Bedfordshire

We installed 6 dual Rolec chargers at Zeus Packaging in Biggleswade, expanding the site to 24 charging sockets across 12 pedestals. The project...

GRANT SECURED: £10,200 • INFRASTRUCTURE: 24 Sockets

View project