Future-Ready EV Charging Installation Touchlight, Hampton

See what is possible for your site

We installed 7 Easee 22kW chargers with 18 future-ready points across 25 bays at Touchlight in Hampton, securing £14,950 in grant funding. The project delivered workplace charging for a biotech facility in a listed former Thames Water building, using steel galvanised conduit to match the heritage aesthetic.

Grant FundedLoad BalancingSmart ChargingEmployee BillingTax BenefitsCharger Selection
EV bay ground markings and charger backplates on the perimeter wall at Touchlight workplace car park, Hampton.
£14,950 GRANT SECURED
25 Bays INFRASTRUCTURE
22kW CHARGING SPEED
10 Days INSTALL TIME
01

Project details

Touchlight is a biotech company specialising in cell-free DNA manufacturing, based in a listed former Thames Water building in Hampton, Greater London. Here is a snapshot of what we delivered.

Property TypeBiotech Laboratory and Office
LocationHampton, Greater London
Completion DateOctober 2025
Project Duration10 Business Days
Chargers Installed7 x Easee 22kW (Active) + 18 Easee Ready
Charger ModelEasee 22kW
Cable SystemSteel Galvanised Conduit and Tray
Load Management4 EV Circuits, 2 Distribution Boards
AccessRFID and App
Funding Secured£14,950 (Infrastructure Grant for Staff and Fleets)
ClientTouchlight (Ben Godfrey, Facilities Manager)
The listed former Thames Water waterhouse with Victorian brickwork and arched windows at Touchlight, Hampton.

We were approached by Ben Godfrey, Facilities Manager at Touchlight, to deliver workplace EV charging at their Hampton facility. Several staff members had already purchased electric vehicles or were looking to take advantage of the Benefit in Kind tax scheme, and the company needed charging infrastructure to support them. Touchlight operates from a listed former Thames Water waterhouse. The building is a distinctive structure with heritage brickwork and industrial architecture that backs onto a Thames Water reservoir. The site presented a challenge that went beyond standard workplace charging: any infrastructure had to complement the building's character, last a minimum of ten years, and serve a sensitive biotech environment. The company wanted a solution that could serve drivers immediately but scale to cover all 25 parking bays as more staff made the switch. Previous quotes had not addressed the aesthetic or longevity requirements to the standard the building demanded.

02

The challenge

The listed former Thames Water waterhouse building housing Touchlight biotech facility in Hampton, Greater London.

Heritage Aesthetics on a Listed Building

Touchlight operates from a listed former Thames Water waterhouse in Hampton. The building's character comes from exposed brickwork and industrial architecture that has been carefully preserved. Any EV charging infrastructure needed to complement this aesthetic, not detract from it. Standard armoured cable running between charge points would have left visible cabling looping in and out of each bay. For a building where the visual appearance had been maintained over decades, that approach was not acceptable. The infrastructure needed to look like it belonged, using materials and methods that matched the industrial heritage of the site.

EV-ON installer in branded hi-vis vest working on the EV charging installation at Touchlight, Hampton.

Protecting Recent Multi-Million Pound Site Works

The entire site had recently undergone multi-million pound groundworks and surface upgrades. Cutting into newly finished surfaces to install EV charging infrastructure risked undoing work that had only just been completed. The main car park required cable trenching and containment runs along the perimeter wall, while the gatehouse area needed separate underground ducting for a pedestal charger at bays 25 to 27. Every metre of reinstatement had to be invisible once complete. The expectation was clear: it should look like we had never been there. With the scale of recent investment in the site, impeccable workmanship was non-negotiable.

Easee charger backplates mounted on concrete perimeter wall with steel galvanised conduit at Touchlight, Hampton.

Scaling for a Biotech Workforce Adopting EVs

Touchlight is a biotech company at the forefront of genetic medicine. Staff were already pushing for EV charging to take advantage of the Benefit in Kind tax scheme, which makes electric company cars significantly cheaper to run than petrol or diesel equivalents. The infrastructure needed to serve the seven drivers who wanted charging immediately while preparing all 25 bays for future activation. With staff actively exploring salary sacrifice schemes and company car options, demand was expected to grow quickly. Any solution had to balance immediate demand with long-term scalability, without requiring a second installation when more staff made the switch.

Client testimonial pending.
TouchlightHampton, Greater London
03

Our solution

View along the charger run and steel conduit with the listed waterhouse building and car park at Hampton.

Steel Galvanised Conduit with Heritage-Sensitive Routing

We designed the cable routing using steel galvanised conduit and tray along the perimeter wall of the main building, covering bays 1 to 24. The conduit gives a clean, industrial finish that complements the waterhouse building's brickwork and exposed architecture. We made use of the large concrete walls separating the building from the adjacent Thames Water reservoir as a natural routing surface. This avoided the need for freestanding cable management and kept the infrastructure tight to existing structures. The result is a cable system that looks deliberate and permanent, not retrofitted. The steel galvanised finish is built to last 10 years minimum and matches the industrial character of the listed building.

Pedestal charger at the security gatehouse with the full listed building facade visible at Touchlight, Hampton.

Precision Groundworks and Separate Distribution

For the gatehouse area, we installed underground ducting to connect bays 25 to 27 with a separate distribution board in the security house. A pedestal-mounted Easee charger serves this section of the car park independently from the main building run. Across the whole site, we matched surface reinstatement to the recently completed upgrades, using the same materials and finishes. The groundworks were completed without disrupting daily operations or security access. Every surface was restored to the standard set by the multi-million pound works that had preceded our installation. The pedestal sits cleanly within the existing landscape.

Steel galvanised conduit routing below Easee charger backplates on the concrete perimeter wall at Hampton.

Easee Future-Ready Network with Staff Billing

We installed 7 active Easee 22kW chargers and terminated, tested, and commissioned 18 Easee Ready points across the remaining bays. Any future-ready bay can be activated with a charger unit without re-cabling or additional groundworks. Staff access charging via RFID card or the app, and our management platform handles all billing automatically. Each session is logged, costed per kWh, and charged to the individual driver. This supports the Benefit in Kind tax advantage that was driving staff interest in switching to electric vehicles. The platform gives the facilities team full visibility of usage, costs, and charging patterns without manual admin.

04

The results

Project outcomes

Touchlight now has 7 operational Easee 22kW chargers with 18 future-ready points across 25 bays. Steel galvanised conduit runs neatly along the perimeter wall of the main building, and the pedestal charger at the gatehouse sits within the recently upgraded landscape without any visible disruption. Two separate distribution boards serve the main car park and security house independently, with load management balancing demand across all four EV circuits.

The £14,950 Infrastructure Grant for Staff and Fleets reduced the upfront investment significantly. The installation was completed in ten business days with no disruption to Touchlight's biotech operations. The future-ready design means activating additional chargers requires only the charger unit itself, with no repeat groundworks or cabling.

Staff who were already interested in the Benefit in Kind tax advantage on electric vehicles now have charging available at work. The management platform handles billing automatically, so the facilities team has no admin burden. Usage data shows healthy uptake, and the availability of on site charging is encouraging more staff to consider making the switch. EV-ON maintains the network under an ongoing maintenance package that conforms with the building's insurance requirements.

Services provided

  • Site survey and electrical capacity assessment
  • Infrastructure Grant for Staff and Fleets application and administration
  • Cable routing design for heritage-listed building
  • Steel galvanised conduit and cable tray installation (24 bays)
  • Underground ducting and groundworks at gatehouse
  • Supply and installation of 7 x Easee 22kW chargers
  • Easee Ready future-ready point termination and testing (18 bays)
  • Pedestal charger installation at security house
  • 2 x distribution board installation with metering
  • Load management configuration across 4 EV circuits
  • Management platform setup with RFID and app access
  • Full RAMS, handover packs, and O&M documentation

More projects we have delivered.

Every project surveyed, installed, commissioned and monitored by our own team. Grants secured and managed end to end.

View all case studies

Become our next
success story.

Tell us about your site. We survey, explain your options, and give you a clear quote with no obligation.

Enter your details below and one of our solar experts will be in touch.

We reply within one working day. No marketing emails.