Is the Workplace Charging Scheme Still Available in the UK?

4 min read
Grant Funded
Wall mounted Easee chargers beside a Visitors Only bay sign at the Purdicom offices in Wantage.

TL;DR

Yes. The Workplace Charging Scheme is open to new applications until 31 March 2027. The grant rate was uplifted from £350 to £500 per socket on 1 April 2026, and applies to installations completed from that date. UK businesses, charities, and public sector organisations can claim up to 40 sockets across all their sites, covering 75% of the eligible cost. The scheme is now the single OZEV grant for workplace EV charging following the closure of the EV Infrastructure Grant for Staff and Fleets on 31 March 2026.

Get in touch with one of our experts and see how much you could save with the grants available.

RELATED: What is the Workplace Charging Scheme in the UK?

The Scheme Is Open Until 31 March 2027

The Workplace Charging Scheme is open to new applications until 31 March 2027. This is a 12 month extension confirmed alongside the wider OZEV grant changes that took effect on 1 April 2026.

The application process is unchanged. You apply online through the OZEV portal. You receive a voucher code within 5 working days. The voucher is valid for 180 days and is shared with your OZEV approved installer, who deducts the grant from your invoice on completion.

What Has Changed in 2026

Two things changed on 1 April 2026:

Rate uplift. The grant per socket increased from £350 to £500. This rate applies to installations completed from 1 April 2026 onwards, regardless of when the application was submitted.

Education uplift. State-funded education institutions now claim £2,000 per socket through the Workplace Charging Scheme, a significant uplift on the previous rate.

Vouchers awarded before 1 April 2026 remain valid for the previous £350 rate. If your installation completes from 1 April, the higher £500 rate applies.

The 40 socket cap across all your sites is unchanged. The 75% cost coverage cap is unchanged. The eligibility criteria for businesses, charities, and public sector organisations are unchanged.

RELATED: What replaced the EV Infrastructure Grant for businesses?

Why the Scheme Now Matters More

Until 31 March 2026, the Workplace Charging Scheme worked alongside the EV Infrastructure Grant for Staff and Fleets. The Infrastructure Grant covered cabling, groundworks, and infrastructure up to £15,000 per site. The Workplace Charging Scheme covered the chargepoint hardware.

The EV Infrastructure Grant closed to new applications on 31 March 2026. There is no direct replacement.

The Workplace Charging Scheme is now the single OZEV grant for workplace EV charging. The rate uplift from £350 to £500 partly offsets the loss of the Infrastructure Grant, but the headline funding value for projects with significant cabling or groundworks is lower than under the previous combined regime.

Who Qualifies

The scheme is available to:

UK businesses registered at Companies House or VAT registered with HMRC. Charities. Public sector organisations including local councils and NHS bodies. State-funded education institutions (at the higher £2,000 per socket rate).

You must have dedicated off street parking where the chargers will be installed. The chargepoints must be for staff or fleet vehicle use. They cannot be accessible to the public.

All work must be carried out by an OZEV authorised installer.

How Much You Can Claim

The maximum claim is 40 sockets at £500, totalling £20,000 across all your sites. The 40 socket cap applies per applicant, not per site. A multi-site business installing 8 sockets at each of 5 sites can claim the full 40 sockets at £500.

For a single site installing 10 chargers, the grant value is £5,000. The scheme covers 75% of the purchase and installation cost per socket up to that £500 limit, whichever is lower.

How to Apply

We handle the full application as part of every workplace project. The process runs in this order. We complete a free site survey. We submit the Workplace Charging Scheme application and receive your voucher. We install the chargers and claim the grant on your behalf. The grant value is applied to your quote upfront. You pay the reduced price.

If you are unsure how the changes affect a project you are planning, contact us. We will scope your project on current funding terms.

Workplace Charging EV charging installation by EV-ON
Service page Workplace Charging Learn more about workplace charging solutions Visit service page

We handle the full Workplace Charging Scheme application from start to finish. Ready to Claim Your Workplace Charging Grant?

See real sites where grant funding cut the cost.

View all case studies

Every site is
one survey away
from EV charging.

Tell us about your building or site. We survey, explain your options, and give you a clear quote with no obligation.

Enter your details below and one of our solar experts will be in touch.

We reply within one working day. No marketing emails.