What Replaced the EV Infrastructure Grant for Businesses in the UK?

4 min read
Grant Funded
An EO Genius 2 charger with green LED active on a metal pedestal in Hollywell's office car park in St Albans.

TL;DR

The EV Infrastructure Grant for Staff and Fleets closed to new applications on 31 March 2026. It paid up to £15,000 per site for cabling and groundworks, plus £350 per active socket. The replacement is the Workplace Charging Scheme, which was uplifted from £350 to £500 per socket on 1 April 2026. There is no per-site cap, but a 40 socket cap across all your sites. The Workplace Charging Scheme is open to new applications until 31 March 2027.

Get in touch with one of our experts and see how much you could save with the grants available.

RELATED: What grants are available for business EV chargers in the UK?

What Closed

The EV Infrastructure Grant for Staff and Fleets was the main funding route for workplace EV charging infrastructure until 31 March 2026. It paid up to £15,000 per site, with a split of £500 per provisioned parking bay and £350 per active socket. It covered 75% of eligible costs.

OZEV closed the grant to new applications on that date. There is no direct successor scheme for the per-site infrastructure cap. The decision was to consolidate workplace funding into a single route.

Pending applications submitted before the closure can be claimed by installers until 26 May 2026, with a final resubmission deadline of 6 July 2026.

What Replaced It

The Workplace Charging Scheme is now the single OZEV grant for workplace EV charging. It existed before 1 April 2026 alongside the Infrastructure Grant, but the rate was uplifted from £350 to £500 per socket on that date to partly offset the closure.

Key terms:

  • £500 per active socket installed
  • Covers up to 75% of purchase and installation cost per socket
  • Up to 40 sockets across all your sites
  • Available to UK businesses, charities, and public sector organisations
  • State-funded education institutions claim £2,000 per socket through the same scheme
  • Open to new applications until 31 March 2027

For a 10 socket workplace installation, that is £5,000 in grant funding. For a portfolio business installing 8 chargers at each of 5 sites, the maximum is £20,000.

RELATED: What is the Workplace Charging Scheme in the UK?

What It Means in Practice

The change reduces total grant value for most workplace projects compared to the old Infrastructure Grant. A 10 socket workplace installation that previously qualified for around £13,500 in combined funding now receives £5,000.

For multi-site operators, the 40 socket portfolio cap allows phasing across locations. A business installing 8 sockets at each of 5 sites can claim the full 40 sockets at £500, totalling £20,000.

The cabling, distribution upgrades, and groundworks that the old grant covered as separate line items are no longer separately funded. Workplace projects with significant civil works carry those costs directly.

How the Application Process Has Changed

The Workplace Charging Scheme process is faster than the old Infrastructure Grant. You apply online and receive a voucher within 5 working days. The voucher is valid for 180 days.

Your installer claims the grant directly on completion of the install. You see the grant value applied to your quote from day one and pay the reduced price upfront.

We handle the full application as part of every project. The single grant route also makes the paperwork simpler than the previous combined Infrastructure Grant + Workplace Charging Scheme structure.

How to Apply

The first step is a free site survey. We assess the layout, electrical capacity, and your funding eligibility. We then submit the Workplace Charging Scheme application and install the chargers. The grant value is deducted from your quote upfront. You pay the reduced price.

If you are unsure how the closure affects a project you were planning, contact us. We will scope the project on current funding and confirm what your business can claim.

Workplace Charging EV charging installation by EV-ON
Service page Workplace Charging Learn more about workplace charging solutions Visit service page

We handle the full Workplace Charging Scheme application end to end. Ready to Apply for the New Workplace Grant?

See real sites where grant funding cut the cost.

View all case studies

Every site is
one survey away
from EV charging.

Tell us about your building or site. We survey, explain your options, and give you a clear quote with no obligation.

Enter your details below and one of our solar experts will be in touch.

We reply within one working day. No marketing emails.