Aerial view of logistics depot with electric vans charging at multiple stations overnight

EV Charging Solutions forFleet Vehicles

We install EV charging infrastructure for commercial fleets across the UK. From depot charging for overnight turnaround to driver home charging solutions. We handle grant applications, electrical upgrades, telematics integration and driver billing.

Trusted by
  • Hallmarq
  • iomart
  • Touchlight
  • NHS
  • S.C. Johnson
  • IOM3
  • HG Construction
  • Zeus Packaging
  • Hollywell
  • Liquidline
  • Stack
  • Cyril Leonard
  • Colin Cohen
  • Hospice of St Francis
  • Purdi
  • Syndico
  • Parkgate
  • Fifield
  • JFM
  • Scofell
  • JAR
  • CSPC
  • PAYE
  • WEP
  • Temis

28% of new cars sold must be electric in 2025. That rises to 80% by 2030. The Zero Emission Vehicle mandate is here. Manufacturers are pushing EVs into fleet channels first. Your next company vehicles will likely be electric whether you are ready or not.

Rolec EV charger plugged into a Zeus Packaging fleet vehicle, Biggleswade

82% of new battery electric vehicles are now registered by companies. Fleets are leading the transition. Cut fuel costs by 50 to 70% compared to diesel or petrol, reduce maintenance costs by 20 to 40% over the vehicle lifecycle, and access the 2 to 3% Benefit in Kind tax rate on company EVs.

Installing depot charging involves challenges that go beyond a simple plug. Power capacity constraints at existing sites, overnight turnaround for vehicles that run all day, driver reimbursement for home charging, and the ongoing billing, telematics integration and maintenance all need to work as one system. This is where most fleet projects stall.

We specialise in solving these fleet challenges. A single site survey tells you what your supply can take, what the Workplace Charging Scheme will fund, and how depot and driver charging gets billed. Fleet managers get a turnkey solution that removes all complexity.

We bring EV charging to every fleet.

We specialise in EV charging for businesses. Practical expertise, turnkey delivery from design to completion, and management that does not stop at handover.

Since 2019

Installing workplace charging since 2019. We install EV charging infrastructure for offices, business parks, retail premises and commercial buildings across the UK.

£400k Secured

Over £400,000 in government grants secured for clients. We handle your grant application, maximising funding and ensuring compliance.

2,000+ Charge Points

Our team handles everything from DNO applications and electrical upgrades to staff onboarding and long-term support.

99% Uptime

We monitor every charger around the clock and resolve faults remotely, often before you notice, keeping the network running to a 99% uptime standard.

An evon engineer in branded hi-vis wiring the internals of a Rolec EV charger on site in CranbrookDual EV chargers on a reserved fleet bay at Hollywell, St AlbansAn Easee home EV charger mounted beside a brick drivewayA run of EV chargers along the car park at the Touchlight installation in HamptonAn evon pedestal EV charger illuminated at dusk in a workplace car parkAn evon engineer testing an Easee EV charger during a maintenance visit at Millbrook Park

Everything you need from one EV charging partner.

Fully authorised OZEV grant installers and NAPIT accredited electricians. We handle your Workplace Charging Scheme application, maximising funding and maintaining compliance.

AC and DC charging for overnight fleet turnaround. Your vehicles charge while parked, ready for the first shift. Load management prevents costly supply upgrades.

Company car drivers who charge at home get accurate billing data for expense claims. Usage reports show exactly how much energy was used and what it cost. No more estimated mileage.

Our systems distribute power intelligently across all chargers. Add more charge points without expensive infrastructure upgrades. The network grows with your fleet.

Charging data integrates with your existing fleet management platforms. See vehicle charge status alongside location and utilisation. One dashboard for your entire operation.

Every installation includes remote monitoring and a UK based help desk. We identify issues before they cause downtime. Your fleet stays operational.

Accredited to the highest standard. Every project certified to the highest industry standards from design through to commissioning, signed off in-house by our own accredited team.

The grant covers most of the cost.

The Workplace Charging Scheme covers 75% of socket costs for fleet charging. We confirm what your depot qualifies for, handle the entire application process, and deduct the funding directly from your quote.

£500
per socket

75% of the cost to buy and install each chargepoint, covered by the scheme.

£20,000
available

Up to 40 sockets across all your sites, claimed in a single application.

We are not tied to one brand. We select the right charger for your site, your vehicles, and your budget, from home wall units to high power rapid chargers.

The business case for fleet charging.

Four reasons it pays to electrify

The ZEV mandate is accelerating and fleets are leading the transition. Here are four reasons it pays to install depot charging now.

A row of pedestal EV chargers and marked charging bays along a commercial car park
Explore the four reasons
Reason 01

Cut fuel costs by 50 to 70%

Electricity costs 50 to 70% less per mile than diesel or petrol on a typical fleet duty cycle. Overnight depot charging at your own rate beats public charging and forecourt fuel every time. The saving compounds across every vehicle, every shift.

Reason 02

Reduce maintenance by 20 to 40%

Electric drivetrains have fewer moving parts. No oil changes, no exhaust systems, less brake wear. Fleets report 20 to 40% lower maintenance costs over the vehicle lifecycle, with less downtime off the road.

Reason 03

A 2 to 3% Benefit in Kind rate

Company EVs sit at a 2 to 3% Benefit in Kind tax rate, a fraction of the rate on petrol and diesel equivalents. Drivers keep more of their pay and the fleet stays attractive to the people who run it.

Reason 04

Ready for the ZEV mandate

28% of new cars sold must be electric in 2025, rising to 80% by 2030. Manufacturers are pushing EVs into fleet channels first. Installing charging now means the infrastructure is ready before the vehicles arrive.

Your fleet, EV ready in four steps. From first survey to live depot chargers, managed end to end.

01

Survey and design

We assess your power capacity, analyse vehicle schedules, and hand you a detailed fleet proposal with the grant already worked in.

An engineer pointing at a car park EV charging layout drawing across two desktop monitors during installation design
02

Grants and approvals

We apply for the Workplace Charging Scheme at £500 per socket and handle the DNO notifications and approvals. You benefit from day one.

A printed evon EV chargepoint proposal document on a desk, laid over a car park layout drawing
03

Installation

Our own engineers install the distribution, load management and AC and DC charge points, timed around your vehicle schedules.

An evon engineer wiring the internals of a Rolec EV charger during installation
04

Testing and handover

We test, certify and commission, train your fleet managers on the portal, onboard your drivers, and submit the final grant claim.

A commissioned Easee EV charger in use with a company vehicle

Your depot rollout starts here. One survey, one team, one fixed proposal with the grant deduction applied.

Billing, access, monitoring. Handled.

We handle billing, access and monitoring in the background. Drivers scan to start, finance gets clean data, and we watch charger health around the clock. If a unit goes offline, we know before you do.

Billing and driver reimbursement

Every session is metered and billed automatically, across depot, staff and driver home charging. Drivers submit expense claims directly from the app with usage data attached. Finance teams get clear audit trails for tax compliance.

A finance team member reviewing an evon automated EV charging billing statement

Access control

Assign charging permissions for fleet drivers, staff or visitors. Control who can charge, when and at what rate, by app, QR code or RFID card.

Monitoring and maintenance

We watch every charger around the clock. Remote monitoring fixes most issues instantly, and our own engineers handle maintenance and annual safety inspections for the life of the system.

Platform capabilities

  • Automated billing
  • Access control
  • Usage reporting
  • Remote management
  • Remote monitoring
  • Fault detection
  • Maintenance
  • Repair and O&M

Your fleet EV charging questions, answered. Everything fleet managers, finance directors, and operations leads ask before electrifying a depot.

Cost

How much does fleet EV charging installation cost?

Small fleets (5-10 vehicles) typically cost £15,000 to £40,000 before grants. Medium fleets (10-30) cost £40,000 to £100,000. Large depots (30+) reach £100,000 to £300,000. WCS reduces socket cost by 75% up to £500.

5 min read
Grants

What grants are available for fleet EV charging?

The Workplace Charging Scheme is the primary grant. £500 per socket (uplifted from £350 in April 2026), up to 40 sockets across all your sites. Covers 75% of socket cost. Open until 31 March 2027.

5 min read
Depot

What is depot charging and how does it work?

EV charging infrastructure at a central location where fleet vehicles return at the end of each shift. Vehicles plug in and charge overnight or during downtime. Most fleets use 7-22 kW AC for overnight turnaround, DC rapid added for high-utilisation vehicles.

5 min read
Hardware

AC or DC charging: which does my fleet need?

Most fleets need primarily AC charging (7-22 kW). Vehicles parked overnight for 8+ hours achieve 100% charge. DC rapid (50 kW+) is for vehicles needing fast turnaround. We assess duty cycles to recommend the right mix.

4 min read
Timeline

How long does fleet EV charging installation take?

Typical projects run 6 to 12 weeks from initial survey to commissioning. Larger depots or sites requiring DNO work may take longer. We provide a detailed timeline at the initial site survey.

4 min read
Driver pay

How do we reimburse drivers for home charging?

Our platform tracks every charging session at driver home locations. Drivers submit expense claims directly from the app with usage data attached. The HMRC AER rate is 7p per mile, used to reimburse business miles tax-free.

4 min read
ZEV mandate

What is the ZEV mandate and how does it affect my fleet?

The Zero Emission Vehicle mandate requires manufacturers to sell increasing percentages of EVs each year. 28% in 2025, 80% by 2030, 100% by 2035. Manufacturers are prioritising fleet channels for EV allocation. Charging infrastructure is essential for fleet continuity.

5 min read
Technical

How does smart load management work for fleet charging?

Load balancing distributes available power across all chargers automatically. Priority settings mean urgent vehicles charge first. The system adapts in real time based on demand. Add more chargers without an expensive supply upgrade.

5 min read

Twenty plus questions covering grants, depot charging, AC versus DC, driver reimbursement, telematics, and ZEV mandate timelines.

View all fleet FAQs

Your fleet is one
survey away from
electric.

Whether you have a depot project in mind or just questions, provide your details or call our fleet EV team direct. We will discuss the duty cycles, the grant available, and the install routes that fit. No commitment.

Enter your details below and one of our fleet EV charging experts will be in touch.

We reply within one working day. No marketing emails.