Can I Still Combine the EV Infrastructure Grant and Workplace Charging Scheme in the UK?

3 min read
Grant Funded
Electrician routing SWA cables through overhead cable tray inside the Zeus Packaging warehouse, Biggleswade.

TL;DR

No. The EV Infrastructure Grant for Staff and Fleets closed to new applications on 31 March 2026, so the two grants can no longer be combined. Fleet EV charging is now funded through the Workplace Charging Scheme alone, which was uplifted to £500 per socket on 1 April 2026. You can claim up to 40 sockets across all your sites, for a maximum of £20,000 across your portfolio. Pending Infrastructure Grant applications can be claimed by your installer until 26 May 2026.

Get in touch with one of our experts and see how much you could save with the grants available.

RELATED: What grants are available for fleet EV charging in the UK?

The Two Grants Can No Longer Be Combined

Until 31 March 2026, fleet operators could stack two OZEV grants on the same site. The EV Infrastructure Grant funded cabling, trenching, and groundworks up to £15,000 per site. The Workplace Charging Scheme added £350 per socket for chargepoint hardware. On a typical fleet project this could mean up to £29,000 in combined funding.

That combination is no longer possible. The EV Infrastructure Grant for Staff and Fleets closed to new applications on 31 March 2026. Fleet EV charging is now funded through the Workplace Charging Scheme alone.

The Current Funding Route

The Workplace Charging Scheme is now the single OZEV grant for fleet EV charging. The rate was uplifted from £350 to £500 per socket on 1 April 2026.

Key terms:

  • £500 per active socket installed
  • Covers up to 75% of purchase and installation cost
  • Maximum 40 sockets across all your sites
  • Open to UK businesses, charities, and public sector organisations
  • Must use an OZEV authorised installer
  • Open to new applications until 31 March 2027

RELATED: What replaced the EV Infrastructure Grant for fleets?

What It Means for a Typical Fleet Project

Before the closure, a depot installing 10 chargers over a 15 bay infrastructure could claim around £10,000 from the Infrastructure Grant plus £3,500 from the Workplace Charging Scheme. Total £13,500.

After the closure, the same project claims 10 sockets × £500 = £5,000 from the Workplace Charging Scheme alone.

The per-project grant value is smaller. For multi-site fleet operators, the 40 socket cap across all sites means portfolio-wide planning matters more than per-depot calculations.

If You Applied Before 31 March 2026

Installer claims for pending Infrastructure Grant applications submitted before the closure must be completed by 26 May 2026. The final resubmission deadline for any queries is 6 July 2026.

We work through pending claims in date order. If you have an open application, contact us and we will confirm its status and what needs to happen before the deadlines.

How to Maximise Funding for a New Project

With the Infrastructure Grant closed, maximising funding means scoping your project around the Workplace Charging Scheme’s 40 socket cap. For a multi-site fleet operator, that usually means phasing installations across locations to claim the full cap at £500 per socket rather than concentrating sockets at one depot.

We handle the full application and design your project around the socket cap that delivers the best total return.

Fleet Charging EV charging installation by EV-ON
Service page Fleet Charging Learn more about fleet charging solutions Visit service page

As OZEV approved installers, we handle the Workplace Charging Scheme application end to end and structure your project for the maximum socket claim across your portfolio. Want to Maximise Your Grant Funding?

Every site is
one survey away
from EV charging.

Tell us about your building or site. We survey, explain your options, and give you a clear quote with no obligation.

Enter your details below and one of our solar experts will be in touch.

We reply within one working day. No marketing emails.