What Are the UK Regulations for Public EV Chargers in the UK?

3 min read
Smart Charging
Driver plugging in an electric vehicle between two white cars at a Kempower dual charging point.

TL;DR

The Public Charge Point Regulations 2023 set the rules for all public EV chargers in the UK. They require 99% reliability across each operator's rapid network, contactless payment on all new units, transparent pricing in pence per kWh, and a 24/7 helpline for drivers. Operators who do not comply face fines of up to £10,000 per charger.

Get in touch with our team and we will talk you through your options.

RELATED: Do you need planning permission for public EV chargers in the UK?

What the Regulations Cover

The regulations apply to all publicly accessible chargers rated 8kW and above. They came into force on 24 November 2023 with requirements phased across 24 months. Pricing transparency was required immediately. Contactless payment, 24/7 helplines, open data compliance, and 99% reliability standards became mandatory on 24 November 2024. The roaming requirement became mandatory on 24 November 2025.

Contactless payment is mandatory on all new public chargers. Existing rapid chargers (50kW and above) must also accept contactless. Drivers should never need an app or subscription to start a charge. They tap their card or phone and go.

Pricing must be displayed in pence per kWh before a session starts. Connection fees and any other charges must be visible too. The price cannot increase once charging has started. No hidden costs.

Uptime and Reliability

Rapid chargers at 50kW and above must maintain 99% reliability, measured as an annual average across each operator’s rapid network rather than per individual charger. Operators report to the Department for Transport annually using the Open Charge Point Interface (OCPI) protocol, and the first reports covering 2025 were due in January 2026.

Operators must provide a free to use, 24/7 staffed telephone helpline at all charge points. The helpline must offer real time assistance, not voicemail. Operators submit quarterly reports on helpline performance to the Department for Transport.

RELATED: How do public EV charging payments work?

Roaming and Interoperability

From November 2025, every charge point operator must allow payment through at least one roaming provider. A driver with an account on one network can use chargers on another without signing up again. This removes one of the biggest frustrations for EV drivers.

OCPI compliance supports this by creating a common data standard across operators. Charge point operators must update data within 30 seconds of any status change, so drivers always see accurate availability information.

Fines and Enforcement

The Office for Product Safety and Standards (OPSS) enforces the regulations. OPSS may issue a Compliance Notice requiring specific action. Failure to comply can result in civil penalties of up to £10,000 per charger for payment, pricing, helpline, data, and roaming breaches. For reliability breaches, the penalty is up to £10,000 per rapid network.

Site owners who partner with a compliant charge point operator are not directly liable. The operator handles regulatory compliance, reporting, and driver support. We manage all of this as part of every public charging installation we deliver.

Public Charging EV charging installation by EV-ON
Service page Public Charging Learn more about public charging solutions Visit service page

We handle regulatory compliance as part of every public charging project. Need Help With Public Charger Compliance?

Real public charging projects we have delivered.

View all case studies

Every site is
one survey away
from EV charging.

Tell us about your building or site. We survey, explain your options, and give you a clear quote with no obligation.

Enter your details below and one of our solar experts will be in touch.

We reply within one working day. No marketing emails.