There is no single legal interval, and anyone who tells you there is has usually invented it. What exists is a duty to maintain the system so it does not become dangerous. In practice the industry has settled on twelve months for the charger itself. Some parts of the installation are checked more often than the unit as a whole.

Get in touch with our team and we will talk you through your options.

RELATED: Do insurers require EV charger inspections?

Plenty of pages will tell you an EV charger must be inspected annually by law. No regulation says that.

What does exist is a duty. The Electricity at Work Regulations 1989 require electrical systems to be maintained so as to prevent danger. That applies to whoever controls the installation. It deliberately does not name a frequency, because a charger in a coastal car park and a charger in a heated basement do not wear at the same rate.

What the industry has settled on

In practice the answer has converged on twelve months.

Allianz, an insurer, publishes an inspection periodicity table for engineering assets and puts EV charging points at twelve months under those same regulations. Annual inspection is the standard recommendation across the sector, and it is the interval most insurers and managing agents expect to see evidenced.

Twelve months is a sensible default rather than a rule. A site running hard, or one in a difficult environment, earns a shorter interval on its own merits.

Different parts, different cycles

The charger is not the only thing being inspected. Some parts of the installation are checked more often than the unit as a whole.

WhatGoverning standardInterval
EV charging pointsElectricity at Work Regulations 198912 months
Residual current devicesHAUC UK guidance6 months
Fixed wiringElectricity at Work Regulations 19893 or 5 years, depending on type and location
Rented residential stock (EICR)Electrical Safety Standards in the PRS Regulations 20205 years

This is the part most guidance skips. A site that has had an annual charger inspection but no fixed wiring test in eight years is not in the position its records suggest.

RELATED: Does an EV charger need an EICR?

What decides your interval

Three things move it.

How hard the chargers work. A depot turning vehicles overnight puts more cycles through the switching gear and the connectors in a month than a visitor bay does in a year.

What a dead unit costs you. On a fleet site an offline charger is a vehicle that does not run in the morning. On a visitor car park it is an inconvenience. The interval should follow the consequence, not the asset.

The environment. Coastal air, road salt, standing water and full sun all shorten the honest interval.

Monitoring changes the question

An annual inspection tells you the charger was working on the day somebody stood in front of it. It says nothing about the other 364.

Where a site is monitored, the visit stops being the only line of defence. Faults surface as data in between, and the inspection becomes what it should be: a test and a record, rather than the only time anyone looks.

maintenance EV charging installation by EV-ON
Service page maintenance Learn more about maintenance solutions Visit service page

Sources

Primary sources for the claims on this page. Regulations and guidance change, and the date each was checked is shown.

  1. The Electricity at Work Regulations 1989legislation.gov.uk, Checked Aug 2026
  2. Memorandum of guidance on the Electricity at Work Regulations 1989 (HSR25)Health and Safety Executive, Checked Aug 2026
  3. Electrical and EV charging inspection servicesAllianz, Checked Aug 2026
  4. Guide to EV Charging Infrastructure for Local AuthoritiesHAUC (UK), Cited for the 6 monthly RCD interval, Aug 2026
  5. The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020legislation.gov.uk, Checked Aug 2026

Our packages start at annual and run to monthly. A schedule you can put in a budget

Every site is
one survey away
from EV charging.

Tell us about your building or site. We survey, explain your options, and give you a clear quote with no obligation.

Enter your details below and one of our solar experts will be in touch.

We reply within one working day. No marketing emails.