Do I Need a G99 Application for Commercial Battery Storage?

3 min read
Electrical Upgrades
Row of four GivEnergy commercial battery storage cabinets installed in a unit at a UK business premises.

TL;DR

In most cases, yes. Commercial battery storage that connects to the grid almost always needs a G99 application, approved by your network operator before the system can be switched on. Which exact route applies depends on system size and your supply. You do not need to work that out. We handle the application either way, as part of every commercial install.

Get in touch with our team and we will talk you through your options.

Grid paperwork is one piece of the job. See the whole process on the battery storage installation page.

What G98 and G99 actually are

These are the rules that govern connecting generation and storage to the local electricity network. The names come from the Energy Networks Association.

G98 is the light touch route for fully type tested systems up to 16 amps per phase. That is 3.68kW on a single phase supply, or around 11kW across a three phase one, which typically means domestic scale kit. The installer fits it, then notifies the network operator afterwards.

G99 is the full route for generation and storage above that 16 amp limit, and in practice that is where almost all commercial battery storage sits. It needs a formal application, a network assessment, and written approval before the system is energised. The battery cannot legally run until that approval lands.

Why commercial systems usually fall under G99

The route depends on the total generation and storage capacity at the premises and whether the supply is single phase or three phase. The boundary is 16 amps per phase. A battery sized to do real commercial work, cutting peak charges or backing up critical systems, is almost always above it.

Within G99 there are lighter and heavier routes depending on size. Systems up to 17kW single phase or 50kW three phase can use the simplified application form. Some smaller projects also qualify for a fast track G99 route, usually with export capped through an approved limitation device. Larger schemes need the standard application, sometimes with extra network studies. We work out which applies against your site and take it from there.

How we handle it for you

Grid applications, export limits and three phase supplies are our day to day work. We deal with the network operator directly.

We scope the export rating and duty cycle, confirm whether the site is single or three phase, then submit the correct application and manage it through to approval. Network operators can take several weeks to respond, and they may cap export or ask for reinforcement, so we build that into the programme from the start.

You do not fill in a single form. Our own engineers design and install the system to standard, and the connection paperwork is part of the price, not an extra you chase yourself.

Once approved, we set up monitoring and hand over a system that is ready to run. If you want the numbers first, the commercial battery storage cost page covers pricing.

Commercial Battery Storage installation by EV-ON
Service page Commercial Battery Storage Learn more about commercial battery storage solutions Visit service page

We manage G99 applications with the network operator on every commercial install, from scoping to approval. Let Us Handle the Grid Paperwork

Your building is
one survey away
from cheaper power.

Tell us about your site and your bills. We survey, model the savings, and give you a clear quote with no obligation.

Enter your details below and one of our solar experts will be in touch.

We reply within one working day. No marketing emails.