How Much Does EV Charger Installation Cost for a School?

2 min read
Grant FundedElectrical Upgrades
A parent walking a child with a yellow backpack up the steps into a modern school entrance.

TL;DR

A single 7kW wall mounted charger typically costs £950 to £1,250 installed. Dual socket pedestals for car parks cost more, £2,000 to £3,500 depending on groundworks. Then the grant does the heavy lifting: state funded schools claim 75 percent back, up to £2,000 per socket, so most school installations come to roughly a quarter of the headline price.

Get in touch with one of our experts and see how much you could save with the grants available.

RELATED: How much EV charging grant can a school get?

Typical Costs, Before and After the Grant

InstallationBefore grantAfter grant (state funded)
2 wall mounted sockets, staff car park£1,600 to £2,400£400 to £600
4 sockets on dual pedestals£4,500 to £7,000£1,150 to £1,750
10 socket phased installation£11,000 to £18,000£2,750 to £4,500

Ranges reflect cable runs, groundworks and switchgear. The grant covers 75 percent of each socket’s cost up to £2,000, and school installations rarely hit that cap per socket, so in practice the school pays the remaining 25 percent.

What Moves the Price on School Sites

Distance is the big one, as it is everywhere. School car parks often sit a long way from the main electrical intake, and trenching across a playground or access road adds civils cost. We route around term time realities too, which is a scheduling matter rather than a cost one.

The good news for schools: most have three phase supplies and generous capacity compared with houses, because kitchens and heating already demand it. That usually means no supply upgrade, and load management handles the lunchtime kitchen peak automatically.

RELATED: Will a school’s electrical supply support EV chargers?

Budgeting Advice We Give Business Managers

Size the electrical infrastructure for where you will be in five years and phase the sockets. Cabling and containment are the expensive part, and doing them once for 10 future sockets costs far less than digging twice. The grant’s 40 socket allowance leaves headroom for later phases, and the survey maps the whole route before you commit to anything.

Every quote we issue is fixed, itemised against the grant, and survives governor scrutiny. The site survey that produces it is free, and the application needs one anyway.

School & Education Charging EV charging installation by EV-ON
Service page School & Education Charging Learn more about school & education charging solutions Visit service page

Every school site is different. Ready to Get an Accurate Quote?

Every site is
one survey away
from EV charging.

Tell us about your building or site. We survey, explain your options, and give you a clear quote with no obligation.

Enter your details below and one of our solar experts will be in touch.

We reply within one working day. No marketing emails.